Liquid Cooling in Practice: What Happens When One CDU Fails
Stop a CDU yourself in our live 200 kW simulation and watch what happens.
Interactive simulation  ·  3 min read + play

Every liquid-cooling drawing shows two CDUs and the words "N+N redundancy". But what really happens in the seconds after one unit stops? Don't take our word for it. Break it yourself in the live model below.

▶ Live CDU simulation 200 kW · 5 racks · two CDUs in N+N · every number computed live
Open full screen ↗

01Three things to try

1

Switch CDU A off. The other unit opens its valve and carries the full 200 kW. Coolant supply jumps about 3 °C, then recovers in about two minutes.

2

Switch CDU B off too. Nothing removes heat any more. At full load the racks reach their throttling point in under a minute.

3

Switch both back on, then toggle the load. With two oversized units sharing the load, it returns 5–7 °C warmer than the design value, at about half the flow.

02What it means for your design

  • Size the margin for the failover, not for steady state. The 3 °C bump hits every rack at once.
  • Put CDU pumps and controls on UPS. You have seconds, not minutes.
  • Check the facility side in every mode. Ask whether the design return temperature is a hard limit.

The model uses published CDU ratings and engineering assumptions (heat-exchanger coefficient, valve and pump data). Open "Model assumptions" at the bottom of the simulation for details. Validate against vendor data for your own project.

Want this for your own project?

B.A.T builds live models like this one to test liquid-cooling designs before commissioning.